Technical guarantee measures of steel structure workshop engineering
release time:2019/4/25 23:38:33      hit count:2051

Technical guarantee measures of steel structure workshop engineering

In order to ensure that the fabrication and installation of your steel structure meet the established standards, the following measures are hereby formulated:

1, in strict accordance with the "steel structure engineering construction and acceptance code" gb50205-2001 provisions of the material, line, material, group, welding technical requirements for the steel structure production, hoisting.

2, roof support, steel beam roof beam and other components according to 1:1 lofting, blanking, and considering the contraction of the weld.

3. H-shaped steel group vertical welding machine, submerged arc welding machine, h-shaped steel rectification machine, leveller and other equipment are used for processing, welding and rectification of h-shaped steel group.

4. The friction contact surface of components shall be constructed in accordance with the reasonable construction process. After treatment, the friction surface of components shall not be painted or defaced. The friction coefficient test adopts bolt specimen. The friction treatment, material, high-strength bolt and component are the same, and the friction coefficient is 0.45.

5. The bolt connection hole shall be drilled by CNC drilling machine and its pass rate shall be checked.

6. Pre-assembly of components before leaving the factory, and record the assembly.

7. Hoist steel column and other vertical long-shaped members with the lifting point at 2/3 of the column length. Hoisting roof truss beam and other components, the lifting point is set at equal distance from the key position.

8. Pay attention to the influence of wind force, sunshine temperature and temperature difference during alignment correction of steel column. Therefore, no correction shall be made when the wind force exceeds level 5. Install or reinforce the side beams of the corrected columns immediately. Calibration should be carried out in the morning or when the sun is cooler and in the environment.

9, the production of glass commissioned professional glass manufacturers production and processing. The production of glass shall be in accordance with the current national standards and specifications, and the owner shall confirm the product samples, and provide relevant test reports and supporting documents.

Before the installation of steel structure, the foundation shall be retested to ensure that it meets the installation requirements. During the installation of steel structure, the measurement and correction shall be carried out and the error shall be controlled within the allowed range.

11. Carry out a comprehensive self-correction and self-inspection in accordance with the installation manual and acceptance standards to prevent errors in the work. The quality inspector should make a detailed inspection and record of the work every day, and check the quality together with the owner's representative and on-site project supervisor.

12. Check the material and quality guarantee of the steel. The quality guarantee shall mainly pay attention to the data of yield point, cold bending, room temperature impact and carbon content.

13. Self-inspection and mutual inspection shall be carried out in the process of steel structure fabrication, and special inspection shall be carried out in strict accordance with the steel structure engineering quality inspection and evaluation standard gb50211-95.

18, h-shaped steel plate butt weld inspection, to meet the second-grade weld quality standards.

19. Code for construction and acceptance of steel structure: pay attention to the protection of finished product paint and deformation during transportation. The components are tied firmly, and the binding place is protected by rubber pad to avoid damage of ring paint. And according to the shape of transport vehicles, components of the production of supporting transport frame to prevent deformation.

20. Check the matching conditions of the column foundation axis, the column foot bolts and the bolt holes on the column bottom plate before lifting.

21. After hoisting the steel column, the surveyor shall timely measure, correct and prepare for hoisting the roof truss beam.


News you are interested in
Previous:Jiangsu steel structure development direction of four major advantages
Next:Construction technology of steel structure engineering

Back to list

主站蜘蛛池模板: 黑人好猛厉害爽受不了好大撑| 日本免费啪视频在线看视频| 97久久婷婷五月综合色d啪蜜芽| 永久免费的污视频网站| 欧美成 人 在线播放视频| 久青青视频在线观看久| 国产一二三四区乱码免费| 亚洲6080yy久久无码产自国产| 国产欧美在线一区二区三区| 国产精品久久人妻无码hd毛片| 伊人婷婷色香五月综合缴缴情 | 激情国产一区二区三区四区小说 | 美女扒开尿口让男人桶| 免费无码又爽又刺激高潮的动态图 | 亚洲欭美日韩颜射在线| 精品国产三级a∨在线观看| 98色精品视频在线| 精品国产一区二区三区麻豆| 中文字幕中文有码在线| 综合人妻久久一区二区精品| 国产女爽爽精品视频天美传媒| 2021国产精品国产精华| 免费啪视频在线观看视频日本 | 久久精品国产曰本波多野结衣| 国产精品乱子乱xxxx| 免费视频好湿好紧好大好爽| 三级国产国语三级在线| 国产一区二区三区小说 | 九九99re热线精品视频| 在线 | 18精品免费1区2| 亚洲精品无码少妇30p| 137肉体摄影日本裸交| 欧美在线看片a免费观看| 久久久天堂国产精品女人| 亚洲伊人成无码综合影院| 在线无码av一区二区三区| 日韩精品人成在线播放| 国产亚洲福利在线视频| 国产精品久久久久9999赢消| 国产精品国产对白熟妇| 337p大胆啪啪私拍人体|